Home › Services › Reconstruction Estimating
Reconstruction and Rebuild Xactimate Estimates
Reconstruction Xactimate estimates after water, wind and storm losses: drywall, flooring, cabinets, paint, trim and the adjacent areas that get missed.
Who it's for
Restoration contractors and licensed PAs moving from dry-out to rebuild who need a complete reconstruction scope.
What you get
- A rebuild estimate room by room
- Matching and continuity considered: continuous flooring, shared wall planes, adjacent ceilings
- Line notes explaining scope decisions
- A clear list of anything that needs another photo or measurement
What to send
- Post-mitigation photos labeled and organized by room, including the rooms next to them
- Sketch in ESX format, or access to your Encircle so we can import the sketch into our system
- The mitigation estimate or carrier estimate, if any
- Material details: flooring type, cabinet style, trim profiles
How it's documented
Reconstruction scope is where adjacent areas get skipped. The rooms next door are checked as part of every file, and every line traces back to a photo or measurement.
Redacted job photo or estimate screen goes here (real file, with permission)
Turnaround
Guaranteed within 72 hours; most files are back in 48 hours.
Questions
Do you need the mitigation estimate?
It helps keep both scopes consistent, but it isn't required.
Can you include contents or packout?
Ask when you send the file and include the inventory or photos you have.